Signalling at Hampton Court Junction

Westinghouse Lever frame header picture
HCJ Home | Plans | Stages | Stage 1 | Stage 2 | Stage 3 | Stage 4 | Stage 5 | Stage 6 | Stage 7

Stage 6 - Angel Road Junction
Implement control of the Angel Road signal box
Comprising 4 set of points, 4 coloured light signals, and 4 mechanical signals and associated shunt signals

Track diagram of area of stage 6 works

Angel Road - Track Diagram of are of Stege works

Hampton Court Junction levers 1 thru 12 will provide remote control of Angel Road signal box signalling system for use when it is not necessary to man Angel Road signal box. The siding points on the Goods Loop at Angel Road will still require Angel Road to be manned and operated.